T5 Solar Panel Mounting Rails
Product Details:
Place of Origin: | China |
Brand Name: | Xiamen Kingfeels New |
Certification: | JIS C8955:2017 |
Model Number: | KS-HK-VR1 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 pcs |
---|---|
Price: | 1.1 dollars |
Packaging Details: | 480 pcs/box |
Delivery Time: | 3~5 work days |
Payment Terms: | T/T |
Supply Ability: | 1000000pcs |
Detail Information |
|||
Max Wind Speed: | ≤60m/s | Surface Treatment: | Average Anodizing Thickness 12um |
---|---|---|---|
Colar: | Natural & Black | Snow Load: | ≤80cm |
Material: | AL6005-T5 | Ground Clearance: | ≥0.15m |
High Light: | 6005 Solar Panel Mounting Rails,60m/s Solar Panel Mounting Rails,t5 solar pv mounting rails |
Product Description
T5 Solar Panel Mounting Rails
Lightweight Aluminum Solar Panel Mounting Systems Solar Panel Mounting Rails Uk
Lightweight Aluminum Solar Panel Mounting Systems Solar Panel Mounting Rails Uk
Advantage:
1. High grade aluminum alloy Al600-T5
2. Easy and fast installation with special rail and G nut
3. Tilt angle:any angle within required certain rangle
4. Competitive cost
Some Questions:
What is flange mount?
Flange Mount Bearings tend to be bearing models contained in the housing device. The housing supplies a rigid as well as secure placement while permitting the showing unit in order to rotate inside a clean, included environment. Housed bearings are most often used within light responsibility applications.
What are mounting and accessories?
Boiler mountings are primarily meant for the safety from the boiler as well as for total control associated with steam era process. Boiler Mountings as well as Accessories both would be the essential a part of Boiler. One (Installation) is perfect for safety objective then a different one (Add-ons) are to enhance efficiency associated with Boiler.
Work Time | 8:30~12:00 am 13:30~17:30 pm |
Duration | 12 years |
Minimum Order Quantity | 1000 pcs |
Ground clearance | ≥0.15m |
Size | customized |
Max Wind Speed | ≤60m/s |
Work Time | 8:30~12:00 am 13:30~17:30 pm |
Actual performance drawing
Factory Environment